版权说明 操作指南
首页 > 成果 > 详情

Optimization on closure scheme of multi-span prestressed concrete box-girder bridge

认领
导出
下载 Link by DOI
反馈
分享
QQ微信 微博
成果类型:
期刊论文、会议论文
作者:
Yuan, Ming*;Yan, Dong-huang
通讯作者:
Yuan, Ming
作者机构:
[Yan, Dong-huang; Yuan, Ming] Changsha Univ Sci & Technol, Sch Civil & Architecture Engn, Changsha 410114, Hunan, Peoples R China.
通讯机构:
[Yuan, Ming] C
Changsha Univ Sci & Technol, Sch Civil & Architecture Engn, Changsha 410114, Hunan, Peoples R China.
语种:
英文
关键词:
Bridge Engineering;Closure Scheme;Finite Element Analysis (FEA);Healthy Monitoring Data;Optimization;Prestressed Concrete Box-Girder Bridge
期刊:
Advanced Materials Research
ISSN:
1022-6680
年:
2011
卷:
163-167
页码:
2369-2375
会议名称:
International Conference on Structures and Building Materials
会议论文集名称:
Advanced Materials Research
会议时间:
JAN 07-09, 2011
会议地点:
Guangzhou, PEOPLES R CHINA
会议主办单位:
[Yuan, Ming;Yan, Dong-huang] Changsha Univ Sci & Technol, Sch Civil & Architecture Engn, Changsha 410114, Hunan, Peoples R China.
会议赞助商:
Guangdong Univ Technol, Fac Civil & Transportat Engn
主编:
Li, LJ
出版地:
LAUBLSRUTISTR 24, CH-8717 STAFA-ZURICH, SWITZERLAND
出版者:
TRANS TECH PUBLICATIONS LTD
ISBN:
978-0-87849-206-0
机构署名:
本校为第一且通讯机构
摘要:
The stress state of finished bridge and service stage is influenced by various closure schemes in cantilever construction of multi-span prestressed concrete box-girder bridge. Two typical bridges multi-span prestressed concrete continuous rigid frame bridge and girder bridge are investigated, The stress state in different closure schemes are analyzed using finite element(FE) analysis. Meanwhile, compared the healthy monitoring data, it has been found that taking the closure sequence from side span to middle span in cantilever construction of multi-span prestressed concrete box-girder bridge ca...

反馈

验证码:
看不清楚,换一个
确定
取消

成果认领

标题:
用户 作者 通讯作者
请选择
请选择
确定
取消

提示

该栏目需要登录且有访问权限才可以访问

如果您有访问权限,请直接 登录访问

如果您没有访问权限,请联系管理员申请开通

管理员联系邮箱:yun@hnwdkj.com