版权说明 操作指南
首页 > 成果 > 详情

A flexible extrapolation strategy of oscillation center for large-scale power transmission bases

认领
导出
Link by DOI
反馈
分享
QQ微信 微博
成果类型:
期刊论文、会议论文
作者:
Li, Zhenxing;Hu, Cong;Wang, Zhenyu;Tan, Hong;Weng, Hanli;...
通讯作者:
Li, ZX
作者机构:
[Weng, Hanli; Li, Zhenxing; Li, Zhenhua] China Three Gorges Univ, Hubei Prov Key Lab Operat & Control, Cascaded Hydropower Stn, Yichang 443002, Peoples R China.
[Hu, Cong; Li, Zhenxing; Tan, Hong] China Three Gorges Univ, Coll Elect Engn & New Energy, Yichang 443002, Peoples R China.
[Wang, Zhenyu] Hunan Prov Key Lab Intelligent Live Working Techno, Changsha 410004, Peoples R China.
通讯机构:
[Li, ZX ] C
China Three Gorges Univ, Hubei Prov Key Lab Operat & Control, Cascaded Hydropower Stn, Yichang 443002, Peoples R China.
语种:
英文
关键词:
Large-scale power transmission bases;Oscillation center;Energy rebalancing;Flexible extrapolation strategy
期刊:
Energy Reports
ISSN:
2352-4847
年:
2023
卷:
9
期:
SUPPL-7
页码:
1326-1333
会议名称:
International Conference on Frontiers of Energy and Environment Engineering (CFEEE)
会议时间:
DEC 16-18, 2022
会议地点:
PEOPLES R CHINA
会议主办单位:
[Li, Zhenxing;Weng, Hanli;Li, Zhenhua] China Three Gorges Univ, Hubei Prov Key Lab Operat & Control, Cascaded Hydropower Stn, Yichang 443002, Peoples R China.^[Li, Zhenxing;Hu, Cong;Tan, Hong] China Three Gorges Univ, Coll Elect Engn & New Energy, Yichang 443002, Peoples R China.^[Wang, Zhenyu] Hunan Prov Key Lab Intelligent Live Working Techno, Changsha 410004, Peoples R China.
出版地:
RADARWEG 29, 1043 NX AMSTERDAM, NETHERLANDS
出版者:
ELSEVIER
基金类别:
National Natural Science Foundation of China [52077120]
机构署名:
本校为其他机构
摘要:
The oscillation center may intrude into the generator group when out-of-step oscillation occurs in a large-scale power transmission base. This will lead to an "avalanche" generator tripping of the generator group and seriously affect the safety and stability of the system. Considering that the HVDC system has the advantages of large capacity and long transmission distance, it is often used as a parallel transmission corridor for large-scale power transmission bases. In addition, there is generally a certain reserve capacity in power plants. Starting from inputting reserve capacity and increasi...

反馈

验证码:
看不清楚,换一个
确定
取消

成果认领

标题:
用户 作者 通讯作者
请选择
请选择
确定
取消

提示

该栏目需要登录且有访问权限才可以访问

如果您有访问权限,请直接 登录访问

如果您没有访问权限,请联系管理员申请开通

管理员联系邮箱:yun@hnwdkj.com