版权说明 操作指南
首页 > 成果 > 详情

Construction practice of landslide during tunneling in hilly topography

认领
导出
下载 Link by DOI
反馈
分享
QQ微信 微博
成果类型:
期刊论文
作者:
Li, Pan;Liu, Cheng;Zhang, Yongxing*;Zhang, Jian;Yang, Junsheng;...
通讯作者:
Zhang, Yongxing
作者机构:
[Zhang, Yongxing; Liu, Cheng; Li, Pan] Nanjing Forestry Univ, Sch Civil Engn, Nanjing 210037, Jiangsu, Peoples R China.
[Li, Pan] Soochow Univ, Sch Rail Transportat, Suzhou 215137, Peoples R China.
[Zhang, Yongxing] Changsha Univ Sci & Technol, Natl Engn Lab Highway Maintenance Technol, Changsha 410114, Hunan, Peoples R China.
[Zhang, Jian; Feng, Tugen] Hohai Univ, Coll Civil & Transportat Engn, 1 Xikang Rd, Nanjing 210098, Jiangsu, Peoples R China.
[Yang, Junsheng] Cent S Univ, Sch Civil Engn, Changsha 410075, Hunan, Peoples R China.
通讯机构:
[Zhang, Yongxing] N
[Zhang, Yongxing] C
Nanjing Forestry Univ, Sch Civil Engn, Nanjing 210037, Jiangsu, Peoples R China.
Changsha Univ Sci & Technol, Natl Engn Lab Highway Maintenance Technol, Changsha 410114, Hunan, Peoples R China.
语种:
英文
关键词:
Field investigation;Landslide;Numerical analysis;Treating countermeasure;Tunneling
期刊:
Engineering Failure Analysis
ISSN:
1350-6307
年:
2019
卷:
104
页码:
1234-1241
基金类别:
The numerical analysis of aforementioned landslide during tunneling is also implemented for investigating the cause of landslide during tunneling using ABAQUS software [9], the numerical model of which is shown in aforementioned Fig. 1. The longitudinal calculation range of the numerical model is 229.4 m, and the vertical calculation ranges of both lateral sides are 111.6 m and 20 m respectively, including vertical range of 17.6 m from tunnel bottom to the lower boundary. Moreover, some
机构署名:
本校为通讯机构
院系归属:
交通运输工程学院
摘要:
This paper presents a case study of landslide during tunneling period in hilly topography, and a practical treating countermeasure is also proposed in the study. The field investigation and numerical analysis demonstrate that tunneling in hilly topography with sloping stratification has risk of landslide while heavy rainfall permeates into ground, and a treating countermeasure of anti-slide piles combined with in-layer compacted backfilling is adopted in the practical implementation. Moreover, the implemented treating work demonstrates that the employed countermeasure is capable of treating la...

反馈

验证码:
看不清楚,换一个
确定
取消

成果认领

标题:
用户 作者 通讯作者
请选择
请选择
确定
取消

提示

该栏目需要登录且有访问权限才可以访问

如果您有访问权限,请直接 登录访问

如果您没有访问权限,请联系管理员申请开通

管理员联系邮箱:yun@hnwdkj.com